SubstationSynk simulates complete IEC 61850 environments in software — GOOSE interlocking, MMS communication, sampled values, and factory acceptance testing. No lab hardware required.
Physical lab setups are expensive, slow, and never available when you need them.
SubstationSynk operates in both server and client roles — simulating IEDs and testing against them from the same platform.
Schedule a 30-minute walkthrough of SubstationSynk server mode, GOOSE interlocking, and MMS network capture against a real virtual substation.